EV Charger Installation FAQs
What is the difference between Level 1 and Level 2 charging?
Level 1 uses a standard 120V outlet and adds about 2–5 miles of range per hour, while Level 2 uses a 240V circuit and adds 10–20+ miles per hour.
Does my panel need upgrading for an EV charger?
Not always - a 200-amp panel with two open breaker slots usually has capacity, and load management devices can often avoid an upgrade if capacity is tight.
How long does installation take?
A standard install takes about half a day, while complex runs requiring trenching or long conduit runs can take longer.
Do I need a permit for an EV charger?
Yes, a dedicated EV charger circuit always requires a permit, and Morris-Jenkins handles the permitting and inspection process for you.
Why Morris-Jenkins
You shouldn’t have to deal with complicated installs or long waits. That’s not how we do things. We make it easy from start to finish!
When you schedule EV charger installation in Greenville or the surrounding Upstate area, we’ll handle the details. That includes coordinating with the utility company, pulling permits, and making sure everything’s inspected properly. You don’t have to track anything down or figure it out on your own!
We do the job right the first time, and if you ever need help down the road, we’re easy to reach. Call or text Morris-Jenkins and you’ll always get a real local person, not a machine. We’re here til midnight, and we don’t charge extra for evenings or weekends.
We also offer upfront pricing and Easy Payment Plans so you don’t have to wait to get the electrical work you need.
If you wanna charge your EV faster and skip the hassle, we get there faster to get your home set up the right way.